When embarking on a construction venture, laying a solid foundation is paramount. The triumph of your endeavor, whether it's a sprawling mansion or a modest workshop, heavily hinges on meticulous groundwork and layout. While the methods outlined herein are applicable to projects of varying scales, they are specifically tailored for small to medium-sized residential endeavors. This serves as fundamental guidance for the DIY enthusiast.
Key Steps
Determine the Width and Length of the Foundation
Mark Out One Side. Position stakes at each end, aligning them as desired. Ensure that the stakes are placed along the same edge—namely, corners 1 & 2, not corners 1 & 4 as depicted in Figure 1. Secure the stakes in place using a hammer or similar tool.
Utilize the Pythagorean Theorem to position the final two stakes. In a right-angled triangle, a^2 + b^2 = c^2 where c represents the hypotenuse. Referencing Figure 1 illustrates how this correlates to laying out the foundation. Determine distance A using A=sqrt(w^2+l^2).
Prepare a length of string equivalent to distance A. Start laying it out from one of the initial two staked corners, following approximately along the diagonal line illustrated in the preceding figure.
Assess the length. Measure from the original staked corner that isn't in contact with the string, determining the length (or width) perpendicular to the previously laid side. Drive the third stake into place where the end of the string meets the measured distance of this side. Note: The objective of this step is to ensure the foundation's squareness, necessitating potential adjustments to the angle at which the string and/or side are positioned.
Repeat steps 4 & 5. Commence from the initial stake not utilized in securing the string.
Level the terrain. Employ the metal rake (and shovel if necessary) to roughly even out and flatten the entire area within the foundation's boundaries. This stage merely prepares the area for precise leveling, so avoid excessive time spent on visual estimation.
Position the 2x4 (60 cm x 1.2 meters) along one side of the foundation.
Follow the instructions depicted in Figure 2, ensuring there are no visible gaps between the ground and the bottom of the 2x4. Note: If the board is shorter than the edge it's leveling, align one end of the board with a corner, leaving a gap at only one end. Avoid centering the board.
Rest the level atop the 2x4. If the board is even and without gaps, proceed to step 10.
Excavate beneath the higher side beneath the 2x4. Maintain a smooth base beneath the length of the 2x4 to prevent gaps. Continue until the 2x4 is level. If the board spans the entire side being leveled, skip steps 11 & 12.
Move the board along its length. Fill the gap along the leveled edge. Ensure there's a minimum overlap of 2-3 feet (60cm - 91 cm) between the ground leveled in step 10 and the 2x4.
Repeat steps 9 & 10. Bring the unlevelled ground to match the elevation of the completed area. If there remains an unleveled gap, repeat steps 11 & 12.
Level the surface. Utilize the rake to flatten the area ahead of the board.
Advance the board. Shift it forward by 1-3 feet (30.5 cm - 91 cm) per Figure 3, and repeat steps 9-12. Proceed in this manner across the entire foundation. Between board placements, utilize the rake to even out the ground, aligning it with the leveled area beneath the boards.
Reiterate steps 8-14 perpendicularly. This entails commencing along either of the two edges not yet leveled along their lengths. This process should be smoother than the initial pass, given that the foundation has already been leveled in one direction.
Verify the foundation's levelness. Position the 2x4 diagonally across the foundation's center, with each end directed towards opposite corners (similar to the initial string orientation). Placing the level on top should confirm uniform levelness throughout.
Pointers
-
If you have backfill material, you can opt to adjust the elevation when leveling the ground.
-
In step 4, it might be simpler to secure the string to the starting stake. If you choose this method, ensure that the string still reaches length A from the stake after being tied.
-
Squaring the foundation doesn't mean equalizing the length and width. It signifies ensuring all angles are 90°, resulting in a rectangular shed rather than a parallelogram.
Essentials
- Metal rake
- Measuring tape
- Mallet, hammer, or large rock
- Shovel
- String
- 4 wooden stakes (or any objects suitable for anchoring in the ground)
- Straight 2X4 (60 cm x 1.2 meters) (preferably matching the shorter foundation dimension)
- Level
- Spray paint—you can use it to outline your foundation for neater edges and mark areas that are too high or too low